
SMETA Audit Documents Checklist: Complete List of Required Documents for Indian Suppliers
A SMETA audit typically requires business registration and licences, employee and payroll records, working hours and attendance records, statutory compliance proofs (PF, ESI, bonus, gratuity), health and safety certificates, fire and emergency records, environmental permits, policies and procedures, training records, and subcontractor details.
Before the auditor arrives on-premises, a majority of SMETA reports should be prepared by businesses. For many Indian suppliers, the real problem is not poor working conditions but missing, outdated, or inconsistent records. A business with a poor Sedex report may not only delay delivery orders based on the report, but also demand re-audits. This guide provides a complete SMETA audit document checklist for Indian suppliers, organized by area, with common gaps, worker-readiness tips, and a preparation timeline.
What Is a SMETA Audit?
SMETA refers to the Sedex Members Ethical Trade Audit. It is not a certificate; rather, it is an auditing method. The auditor’s report gets uploaded to the online platform Sedex, which can be viewed by clients you are connected with. The current version, SMETA 7.0, was released on 10th of September 2024, and it replaced SMETA 6.1. The audit is conducted based on the ETI base code, ILO conventions, and local labour laws, making it credible enough for brands and retailers worldwide.
2-Pillar vs 4-Pillar SMETA Audit: How Scope Changes Your Documents
The audit scope decides how many records you must prepare. Here is a closer look at both:
| Audits | Pillars Covered | Typical Buyers Who Ask For It |
| 2-Pillar | Labour Standards, Health and Safety, and a basic Environmental assessment | Retail, FMCG, textiles, packaging, engineering |
| 4-Pillar | Labour Standards, Health and Safety, a comprehensive Environmental assessment, and Business Ethics | Pharma, chemicals, food, automotive and multinational buyers |
Read our detailed guide: SMETA 2-Pillar vs 4-Pillar Audit: 7 Key Differences Suppliers Should Understand.
SMETA Audit Documents Checklist: Complete Guide
Businesses need to gather several documents required for a SMETA Audit. Here is a complete list:
Step 1: Register on Sedex and Update Your Basic Information
Before the audit date is scheduled, businesses must register themselves on the SEDEX platform. It is mandatory. Once the registration is done, complete your Self-Assessment Questionnaire (SAQ). Auditors compare your SAQ with what they find on site, so keep it accurate.
| Information To Prepare | Why It Matters |
| Total workforce, with male, female, and migrant percentages | Auditors use this to select interview samples and check consistency |
| Number of temporary and contract workers | Contract labour is checked as closely as permanent labour |
| Names and addresses of subcontractors and labour brokers | Buyers expect visibility over your own supply chain |
| Site layout, shift timings, and process description | Helps the auditor plan the site tour |
SMETA Audit Documents Checklist (Area-Wise)
A. Employment, Wages, and Working Hours
| Document | What Auditors Verify | Common Gap in India |
| Appointment letters and employment contracts | Written terms in a language workers understand, covering pay, hours, leave, and notice | Missing for contract, temporary, and piece-rate workers |
| Personnel file for every employee | Complete, organised records for each worker | Incomplete files for casual workers |
| Attendance records (12 months) | Daily hours, overtime, and one rest day in seven | Manual registers with unexplained corrections |
| Wage registers, payslips, and bank transfer proofs | Minimum wage, overtime rate, and correct deductions | Round-figure wages with no overtime breakdown |
| Overtime records and consent | Overtime within legal limits and voluntary | Overtime above limits or not recorded |
| Leave and holiday records | Earned, sick, and casual leave given as entitled | Leave balances not maintained |
| PF, ESI, bonus, and gratuity records | Statutory benefits provided on time | Contributions missing for contract workers |
| Maternity benefit records | Legal protection for women workers | Policy exists but no records |
| Recruitment fee and deposit procedure | Workers do not pay fees or deposits to brokers | No written policy covering labour agents |
B. Child Labour, Young Workers, and Forced Labour
| Document | What Auditors Verify | Common Gap in India |
| Age verification procedure and proofs | Date-of-birth evidence for every worker | No age proof for daily wage workers |
| Young worker register (where applicable) | Workers aged 18 or below work only in permitted roles and hours | Young workers placed in hazardous tasks or night shifts |
| Child labour and forced labour policy | Clear prohibition and remediation steps | Policy not displayed or communicated |
| Resignation and exit records | Workers can leave freely with reasonable notice | Withheld wages or documents on exit |
| Document retention records | ID cards and passports remain with workers | Originals held by contractors or management |
C. Policies and Management Systems
| Document | What Auditors Verify | Common Gap in India |
| Corporate responsibility or ethical trade policy | Commitment to labour, health, and safety standards | Policy signed years ago, never reviewed |
| Non-discrimination and equal pay policy | Fair hiring, pay, and termination practices | No written policy |
| Anti-harassment and abuse policy, with committee records | Harassment prevention and confidential reporting | Internal Committee formed on paper only |
| Disciplinary and termination procedure | Standard, fair, and non-violent practices | Informal, undocumented discipline |
| Grievance procedure and grievance register | Anonymous channel, investigation, resolution record | Suggestion box never opened |
| Freedom of association statement and worker committee records | Workers can form or join groups of their choice | No evidence of worker representation |
| Internal audit reports and corrective action tracker | Findings tracked to closure with root cause | Actions closed without evidence |
D. Health, Safety, and Emergency Preparedness
| Documents | What Auditors Verify | Common Gap in India |
| Factory licence and fire NOC | Valid legal permission and fire readiness | Licences expired after workforce expansion |
| Building stability and electrical safety certificates | Safe structure and wiring | Annual electrical inspection skipped |
| Emergency response plan and evacuation map | Written plan, shared in local languages | Plan exists only in English |
| Fire drill records (at least twice a year) | Dates, attendees, and findings | Last drill held over a year ago |
| Fire equipment servicing records | Extinguishers and alarms tested and accessible | Expired or discharged extinguishers |
| Accident, injury, and near-miss register | Incidents investigated with corrective action | Only major accidents recorded |
| Machine maintenance and guarding records | Safe, guarded machinery | Guards removed to save time |
| PPE issue register and training logs | Correct PPE issued and actually used | PPE kept in cabinets, not worn |
| Safety, hazardous material, and induction training records | Signed attendance for each session | Training given verbally with no record |
| Chemical inventory and safety data sheets | Sheets in local language near the point of use | Sheets kept only in the HR office |
| First aid records and trained first aiders | Stocked kits and named responders | Expired items, no first aider on night shift |
| Noise and air quality monitoring records | Regular workplace monitoring | No monitoring plan |
E. Dormitory and Welfare Records (If Applicable)
Dormitory and Welfare Records are also one of the most important aspects of the SMETA Audit Checklist for Suppliers. In the case of the provision of worker accommodation, inspection records must be prepared showing the provision of clean living conditions, safe drinking water, functional toilet facilities, fire alarms, fire extinguishing equipment, emergency exits, and facilities to store personal documents in a secure place. Dormitories should also be a distinct part of the accommodation facility, separate from the production area.
F. Environment Documents (4-Pillar Audits)
| Document | What Auditors Verify |
| Consent to Establish and Consent to Operate | Valid permission from the State Pollution Control Board |
| Air emission and wastewater test reports | Discharge within permitted limits |
| Hazardous and non-hazardous waste records, with disposal manifests | Waste goes to licensed vendors with proper tracking |
| Waste contractor agreements and licences | Contractors are authorised and compliant |
| Energy, fuel, and water consumption data (12 months) | Resource use is monitored and, ideally, reduced |
| GHG and energy reduction targets | Management sets and tracks measurable goals |
| Environmental policy, objectives, and named responsible person | Leadership accountability for environmental performance |
| Environmental training records | Staff understand waste, chemicals, and emissions |
G. Business Ethics and Supply Chain Documents (4-Pillar Audits)
| Documents | What Auditors Verify |
| Anti-bribery and anti-corruption policy | Clear commitment, communicated to relevant staff |
| Code of conduct | Standards of behaviour for employees and partners |
| Whistleblower or speak-up procedure with non-retaliation promise | Confidential reporting is possible and safe |
| Supplier, subcontractor, and labour broker approval records | Your own suppliers are checked for labour and environmental compliance |
| Supplier risk assessment | Risks in your supply chain are identified and managed |
Preparing Workers: The Documents Alone Are Not Enough
Worker interviews take place during each SMETA audit. The auditor meets the workers without the presence of management and must accurately determine the understanding of salaries, working hours, leave, grievance procedures, evacuation procedures, and first aid contacts on the part of the workers. It means regular briefings should be held, and explanations about the company policies, working hours, and payslips should be provided.
Never train the workers on the appropriate answers. It is obvious if workers are using prepared answers, and it may result in consequences. Ensure that all the SMETA Audit Requirements are met with the utmost authenticity.
SMETA Audit Preparation Timeline
Take a look at the time required for the SMETA Audit Documents Checklist Preparation:
| Timeframe | Action |
| 90 days before (first audit) | Confirm scope, register on Sedex, complete SAQ, run a gap check against this checklist |
| 60 days before | Fix critical gaps, renew licences, draft missing policies, start worker awareness sessions |
| 30 days before | Conduct a mock audit, brief department heads, cross-check HR, payroll, and attendance |
| 7 days before | Do a final document review and walk the site for safety and housekeeping issues |
| Audit day | Be open, cooperative, and honest. Do not hide records or coach workers |
| After the audit | Submit root cause analysis and corrective actions within the agreed timeline and upload evidence |
How Long Is a SMETA Report Valid?
SMETA does not issue certificates with a set expiration date. The buyer determines the age of the report and demands a new audit annually, while some may allow a longer duration for low-risk sites. Always check with your buyer’s requirements and whether your budget supports the planned number of audits.
Get SMETA-Ready with True Advisor
Preparing for a SMETA audit becomes much easier with the right guidance. True Advisor provides support in respect of gap assessments, document lists, preparation of regulations, training of staff, as well as mock audits and evaluation of corrective actions. We will help you recognize and correct problems beforehand. This will allow you to prevent possible conflicts with buyers and hold-ups in the process of audit. Get in touch with us now and get SMETA-ready.
Also Read: What Is ISO 9001? A Complete Guide to Quality Management Systems (QMS)
Frequently Asked Questions (FAQs)
1. Is SMETA a certification?
SMETA is an audit approach. You will get an assessment report on the Sedex platform, which is often evaluated by your buyers.
2. Is a SMETA audit compulsory in India?
It is not mandated by law. Nevertheless, the majority of international buyers have made it a requirement to practice.
3. What are the initial documents inspected by auditors?
The contract of employment, proof of age, attendance records, salary records, paychecks, bank proof, and statutory registrations are some of the documents required for an SMETA audit for initial review, since those documents indicate wage and hour compliance.
4. How many months of records should I keep ready?
Keep at least 12 months of attendance, wage, and statutory payment records ready, as auditors usually sample across this period.
5. What happens if my documents are missing or inconsistent?
The auditor may raise a non-conformance. You must then submit a corrective action plan with root cause analysis and evidence within the timeline given.
6. How can True Advisor help me prepare for a SMETA audit?
True Advisor helps with gap assessment, document preparation, policy drafting, staff training, mock audits, and corrective action support, so you walk into the audit organised and confident.